Change Management

7 flashcards

Summary

Change management makes sure changes to systems are planned, assessed, approved, tested and documented so they don't cause outages or security weaknesses. Every change should have a rollback plan and be scheduled to minimize disruption.

In plain words

Change management (as a policy area) plans, trials and implements changes with rollback plans, scheduling them to avoid disrupting workflows. It considers dependent components before making a change.

Detailed explanation

  • Change management: A formal process for controlling changes to IT systems.

Process

  • 1. Request and plan: Describe the change, its purpose and the systems affected.
  • 2. Assess: Analyze risk and impact, including security implications.
  • 3. Approve: A change advisory board or designated approver authorizes it.
  • 4. Test: Trial the change in a non-production environment.
  • 5. Schedule: Implement during an approved maintenance window.
  • 6. Implement and verify: Make the change and confirm it works.
  • 7. Document: Update records, diagrams and procedures.
  • Rollback plan: Instructions for reversing the change if it fails. Also called a backout plan.

Important terms

taken from the text above
Change management
A formal process for controlling changes to IT systems.
Rollback plan
Instructions for reversing the change if it fails. Also called a backout plan.

Examples & real-world scenarios

  • Testing a change in a lab before production.
  • A rollback plan ready before applying an update.
  • Scheduling a change for a maintenance window.

Scenario

An untested firewall change breaks a business app during peak hours. Trialing it first and scheduling it for off-peak, with a rollback plan, would have avoided the outage.

Common mistakes

  • Making changes with no rollback plan.
  • Scheduling changes during business-critical hours.

Practical skills

  • List the stages of a managed change.

What I should remember

  • Change management: Controlled, documented changes.
  • Rollback plan: Restores the previous state if a change fails.
  • Testing: Done before production.
  • Maintenance window: Approved time to make changes.